The set up for the tynemouth bridge exhabition was new experience for me and I think alot of the other students aswell I have never up an art exhabition before.
It was a long set up that lasted from 9.30am till about 3-3.30pm we had these very big boards “shown in image below”, that we had to place along the middle of the bridge in a zig zag patter then put them together zip ties and very large screws and bolts. 
Then after all the boards had been put up and secured, we then had to drill all of the canvas’s on to the boards in a certain order and hand the rest of the work up with the little name tags underneath all of the work, which was quite stressful because we only had the one drill to go round everybody, that made it a bit stressfull because alot of us were panaking that we werent going to get are work up in the space of time we had but thankfully we managed to get it all up and arranged nicely.
Great to read a post about Tynemouth! Lovely 🙂
LikeLike